 |
Success Story:
DYNAMIC ENGINEERING
At Dynamic Engineering, the words
“fast turnaround” are practiced and
tested almost everyday. On a
Wednesday, at 10:30am, we received
a call from Medtronic. One of their lines
was down in Puerto Rico. A piece of steel
needed to be retrieved in Minneapolis,
we were requested to wire edm, grind,
build electrodes, sinker edm and have it
in their inspection department the same
day. It had to be at the airport by 4:00pm.
Dynamic Engineering delivered by 3:00pm.
The next day, the line in Puerto Rico was
up and running.
|
|
|
|
|
|
 |